LS-FP01 A/B Clamp-Lock Flood Barriers | Liansuo
LS-FP01-A and LS-FP01-B combine modular aluminium panels, mechanical side and top clamps and EPDM sealing. Select the model and supports by clear opening width and design flood height for building entrances and continuous barriers.
Choose the model. Confirm the supports.
| Model | Clear opening width | Design flood height | Support arrangement |
|---|---|---|---|
| LS-FP01-A | ≤3 m | ≤1.0 m | No supplemental support |
| LS-FP01-A | >3–6 m | ≤1.0 m | Top compression post |
| LS-FP01-A | >6 m | ≤1.0 m | Intermediate post(s) and diagonal bracing — Subject to project review |
| LS-FP01-B | 3 m | 1.2 m | No supplemental support |
| LS-FP01-B | 3–6 m | 1.2 m | Top compression post |
| LS-FP01-B | 3 m | 1.8 m | Intermediate post(s) and diagonal bracing |
For LS-FP01-B at exactly 3 m × 1.2 m, confirm the selected listed option—no supplemental support or a top compression post—against the project drawings. Listed configurations are selection references; do not extrapolate to other dimensions or site conditions without project review.
Previous model cross-reference: LS-FP01-A = FH-01; LS-FP01-B = FH-02.
Four practical advantages
Clamp-lock deployment
Mechanical clamps replace repetitive bolted panel fixing and compress the seals during deployment.
Modular and lightweight
Aluminium panels and metal fittings combine handling convenience, strength and corrosion resistance.
Engineered sealing
Multiple EPDM seals control hydrostatic leakage paths in the selected barrier arrangement.
Maintenance and reuse
Organised storage and routine inspections support repeat deployment and long-term operation.
Three support arrangements

A: ≤3 m × ≤1.0 m. B: exactly 3 m ×1.2 m. No top compression post, intermediate post or diagonal bracing in these listed arrangements.

A: >3–6 m × ≤1.0 m. B: the listed 3–6 m ×1.2 m configuration. The top compression post restrains panel movement at midspan; no intermediate post or diagonal bracing.

A: >6 m × ≤1.0 m, subject to review. B: 3 m ×1.8 m. Intermediate posts support the panel spans; bracing and anchorage follow project drawings.
Source photographs illustrate support arrangements only. Dimensions and applicable conditions follow the selection table and project drawings.
Match performance evidence to the selected configuration
Static water, wave impact, water current and water retention after dynamic impact are verification items in the catalogue, not proof that every A/B configuration has passed them. Use valid reports matching the model, opening size, design flood height and support arrangement. Check panels, supports, anchorage and leakage performance at the design water level.
Main system design life ≥20 years. This is not a warranty period or a guaranteed seal replacement interval; seals need regular inspection and maintenance.
System components and materials
Aluminium alloy barrier panels with dedicated bottom sealing; stainless or carbon steel tracks with weather-resistant elastomeric seals; dedicated mechanical side and top clamp assemblies. Storage accessories organise the components. Floor tracks and installation tools are configured to project requirements.
Installation and maintenance
- Measure and verify the opening dimensions and installation positions.
- Recess the floor track; level deviation ≤2 mm.
- Anchor wall tracks. Metal-clad walls require embedded steel tubes.
- Stack the numbered panels from bottom to top.
- Use the lever tool to install the clamps and fully compress the seals.
Fit supports to the selected model and installation drawings, and check anchorage. Monthly: clean tracks and inspect seals. Annually: lubricate moving parts and inspect clamps. Periodically: water-test seal integrity.
Standard supply and technical support
Standard supply includes the barrier assembly and specified supports, side tracks, seals, storage rack, and installation and operating instructions. Support covers solution assessment, selection advice, on-site installation guidance, operation and maintenance advice, and Engineering Judgment (EJ) for special projects.
Entrances, logistics and high-risk storage areas
Protect industrial entrances, underground car parks and spaces, electrical and equipment rooms, logistics and roller-door openings, metro stations and sunken plazas, and continuous plant barriers. Around chemical-storage and BESS containers, review entrances, equipment rooms and maintenance routes. This is flood protection, not a claim of fire, chemical-containment or explosion certification.
Selection questions
What is the difference between LS-FP01-A and LS-FP01-B?
A covers the listed ≤1.0 m flood-height configurations. B offers listed 1.2 m and 1.8 m configurations. Supports depend on the clear opening width and flood height; use the A/B selection table rather than a single height limit for the whole family.
When can I avoid intermediate posts and diagonal bracing?
A at ≤3 m × ≤1.0 m and B at exactly 3 m ×1.2 m have listed no-supplemental-support options. A at >3–6 m × ≤1.0 m and the listed B 3–6 m ×1.2 m arrangement use a top compression post, but no intermediate post or diagonal bracing. Wider or higher arrangements require the supports shown in the table and project review.
Does the A/B catalogue establish FM or BSI certification?
The November 2026 A/B catalogue does not provide certification identifiers establishing FM or BSI certification for these configurations. Verify the relevant valid test report for the selected assembly. For projects requiring ANSI/FM 2510 approval, review the separate LS-FP02 product and its approved scope.
What information is needed for project selection?
Provide the clear opening width, design flood height, wall and floor construction, anchorage conditions, access constraints and deployment plan. Confirm the A/B model, support arrangement, installation drawings and valid performance documentation before supply.
LS-FP02 ANSI/FM 2510 · Flood protection products · Project consultation