Service Shaft Firestopping in Taiwan: Does Every Floor Need Protection?

Inspector in a hard hat and high-visibility vest checking a pipe penetration through a wall.
Field inspection photograph reused from Liansuo’s existing firestop article archive. It illustrates checking a wall penetration, not the service shaft discussed here or proof of compliance with a particular firestop system.

In Taiwan, service shaft firestopping depends on the approved compartmentation strategy: a continuous protected shaft enclosure or complete fire-rated floors at each level. The distinction does not remove the need to protect service penetrations at the applicable boundaries.

Published in the Liansuo Knowledge Hub.

For projects in Taiwan, whether a service shaft needs floor-by-floor firestopping depends on the approved compartmentation strategy. The architect or responsible professional engineer must establish whether the space forms a continuous vertical shaft enclosure or separate compartments divided by complete fire-rated floor assemblies at each level. Calling a space a service shaft does not, by itself, establish an exemption from firestopping.

Liansuo Construction Technology recommends identifying that strategy in the design drawings, construction specifications, and installation details before work begins. The documents should specify the fire protection required for the surrounding walls, floor assemblies, access doors, and service penetrations.

The regulatory discussion below applies to Taiwan’s Building Technical Regulations, Building Design and Construction provisions, and the cited administrative interpretation. It is not a statement of US or worldwide code requirements. Projects in other jurisdictions must be assessed under their own applicable codes and approval procedures. The shaft-enclosure provisions discussed here concern buildings of fire-resistant construction; the responsible designer must confirm the rules applicable to the actual project. [1] [2]

Continuous Vertical Shafts: Protect the Enclosure

Where a shaft extends continuously between levels without complete floor assemblies separating its interior at each story, the enclosure provides the vertical compartmentation. In this arrangement, closing the entire shaft opening at every floor is not the defining protection strategy. The approved design must instead establish a continuous protected boundary between the shaft and occupied spaces. [2]

Article 79-2, paragraph 1, requires vertically continuous service shafts within its scope to be separated by walls and fire-protection assemblies with at least one hour of fire resistance, together with the relevant fire-resistant floor construction. Shaft access doors must also provide at least one hour of fire resistance and smoke-control performance. [1]

The critical deficiency is a continuous vertical opening without the required surrounding fire-rated walls and protected access doors. Without those boundaries, fire and smoke can spread rapidly through the shaft to other floors—the risk specifically addressed by the administrative interpretation. [2]

A protected shaft enclosure is not an exemption from penetration protection. Where services pass through its surrounding fire-rated walls, another fire compartment wall, or a fire-rated floor, the penetration must satisfy the applicable requirements of Article 85. For ducts penetrating a fire compartment wall or floor, that article requires a fire damper or fire shutter within the duct on either side of the penetration. The combined duct-and-penetration construction must provide at least one hour of fire resistance. [1]

Floor-by-Floor Compartmentation: Maintain Every Floor Boundary

A different approach applies when complete fire-resistant floor construction separates the service space at each level. Every service opening through those floors must be protected so that the floor boundary remains continuous. For the electrical, communications, water supply, drainage services, and service enclosures covered by Article 85, the combined service-and-penetration construction must provide at least one hour of fire resistance. Duct penetrations must also meet the article’s separate damper or shutter requirements. [1]

The main failure to avoid is a nominally fire-rated floor with unprotected or incorrectly firestopped service openings. The presence of a slab alone does not establish compliant floor-by-floor compartmentation.

The Construction and Planning Agency’s July 12, 2022 interpretation, Letter No. 1111144557, explains the distinction. Where the service space contains continuous fire-resistant floor construction, and the ducts or other services penetrating those floors form combined constructions that comply with Article 85 without leaving a floor opening, the space is not treated as a vertically penetrating service shaft under Article 79-2, paragraph 1. Its surrounding walls and access doors may therefore be exempt from that paragraph’s requirements. [2]

This is a conditional exemption from a specific shaft-enclosure provision—not a general exemption from firestopping, other fire compartment requirements, or the approved project documents. The one-hour values cited here are the minimums stated in the relevant provisions, not a reason to reduce any higher fire-resistance requirement applicable to the project.

Make the Design Requirements Clear Before Installation

Liansuo recommends that the architect or responsible professional engineer clearly identify the following in the project documents:

  • Whether the service space is a continuous vertical shaft or is separated at every floor.
  • The required fire resistance of surrounding walls and access doors, including applicable smoke-control requirements.
  • Which floor assemblies form fire compartment boundaries.
  • The required treatment of piping, cables, and duct penetrations.
  • The firestop system’s permitted substrates, service materials, and opening dimensions.

System applicability matters as much as the material selected. A firestop system includes the wall or floor assembly, the penetrating service, and the specified protection materials and installation details. UL Solutions’ application guide explains that hourly ratings apply to complete systems, not individual components, and that components cannot be freely substituted between systems. This supports a system-based review; it does not replace Taiwan’s project approval requirements. [3]

Verify the Approved Strategy in the Field

Installers and inspectors should check the work against the approved drawings and applicable system details. They should not decide independently that a space called a service shaft is exempt from firestopping. If the drawings do not identify the compartment boundaries or required penetration treatment, the issue should be referred to the responsible designer before proceeding.

For a continuous vertical shaft, verify the protected enclosure and the penetrations through its boundaries. For floor-by-floor compartmentation, verify the continuity of each fire-rated floor and the protection of every service opening through it.

Independent firestop inspection can help compare installed details with the applicable tested or approved systems and project documents. Liansuo’s accredited inspection activities are limited to its listed scope; inspection does not replace the designer’s responsibilities or the authority’s acceptance of the project. [4]

The practical sequence is straightforward: define the compartmentation strategy, document its requirements, install the applicable systems, and verify the work. This avoids both a vertically open shaft without a protected enclosure and a floor-separated service space with unprotected penetrations.

References

[1] Taiwan Building Technical Regulations — Building Design and Construction, Articles 79-2 and 85

[2] National Land Management Agency: Construction and Planning Agency Letter No. 1111144557, July 12, 2022

[3] UL Solutions Firestop and Joint Application Guide, Section 5b

[4] Liansuo Independent Firestop and Fire-Resistant Duct Inspection Services